New point of generation or self-consumption

Find all the information about this service here

Find all the information about this service here

IWhat can you do here?

On this page, we explain how to request the connection of a new generation point or self-consumption installation to the distribution grid.

 

How to start your application

To connect a distributed generation installation, the first step is to request grid access and connection via the distribution company.
This procedure is necessary to guarantee the safety and quality of the supply.

You can submit your application online from your private area, under the section:
Grid connection / New self-consumption or generation application.

 

What information will we ask for?

When applying, you must provide basic information about the installation.
Among other details, we will need:

  • The location of the generation installation.
  • The type of installation.
  • The connection voltage level.

Required documentation

You must also provide technical documentation, such as:

  • A single-line diagram of the installation.
  • The installation's technical design report or specifications.

For self-consumption, we will need the CUPS (Universal Supply Point Code), which you can find on your bill.

 

Applicable procedure

Depending on the capacity and voltage of the generation installation, one of two procedures will apply.
The simplified procedure follows the same steps as the general one, but with shorter timeframes.

Abbreviated
<= 15kW
General
> 15 kW

Sign up to the customer portal to apply for a generation or self-consumption connection

Applicable regulatory framework

The connection of generation and self-consumption installations is governed by current electricity sector regulations, which establish:

  • The classifications of generator types (Royal Decree 413/2014).
  • The administrative, technical, and economic conditions for their processing and operation (Royal Decrees 1183/20, 1955/00 and 1699/11 )

 

Other ways to apply 

If you are an individual, you can also submit the form and its associated documentation at our commercial offices and service points, retaining proof of the submission date.

 

Need help?

If you have any questions about the process:

  • Read our guides on generation applications.
  • Email us at conexiones.edistribucion@enel.com.

Self-consumption
Access capabilities at network nodes

Find out about the availability of power for generation facilities at our network nodes. All information relating to occupied, available and unresolved admitted access capacity is included.