New point of generation or self-consumption

If you need a connection for a new point of generation or self-consumption, enter your private area with your details and attach the necessary documentation.

Here you have the information for the connection of a new generation point and for self-consumption installations.

If you are interested in a distributed generation connection, the first thing you need to do is submit a request for access and connection through the distributor. Only then can we establish the necessary conditions to guarantee the safety and quality of the supply to the grid where the installation is located.Once you are in the private area, you can submit your request online from the section Grid connection / New self-consumption request / Supply generation.

You will also need to fill in a series of details so that we can process everything correctly. For example, we need to know where the generation installation will be located, the type of installation and the voltage level of the connection.Among other things, we will ask you for a single-line diagram of the installation, as well as a technical design report or project for the installation in order to process your request. In the case of self-consumption, we need the CUPS, which you can find on your bill.

Depending on the power and voltage of the generation facilities to be connected, we will have to follow one procedure or another: (The abbreviated procedure will be governed by the same principles as the general procedure, although the deadlines will be reduced by half).

Abreviado
<= 15kW
General
> 15 kW

We have moved the application form to the private area of the website. You can access it by clicking on the button below.

Access to the private area

Royal Decree 413/2014 establishes the different classifications of generator types, as well as the administrative conditions for their processing and operation.

Royal Decrees 1183/20, 1955/00 and 1699/11 set out the technical and economic conditions linked to the process of connecting these facilities to the electricity distribution network.

In accordance with the provisions of Article 5 of Royal Decree 1183/2020, if the applicant is a natural person, they may also submit the form and associated documentation at authorised commercial offices and service points, recording the submission and the date on which it took place.

If you have any questions or require clarification regarding the procedure, please consult our guides on the processing of generation requests, or send us an email at conexiones.edistribucion@enel.com.


Self-consumption
Access capabilities at network nodes

Find out about the availability of power for generation facilities at our network nodes. All information relating to occupied, available and unresolved admitted access capacity is included.